How to Create and Assign Cost Resources for Schedule Cost Loading in Primavera P6

 

How to Create and Assign Cost Resources for Schedule Cost Loading in Primavera P6

 

Most planners build their schedule. Fewer load it with cost.

 

If you're using Primavera P6 and your schedule isn't cost-loaded, you're missing one of the most powerful tools in your project controls toolkit.

 

In this short video, I walk you through how to load a cost schedule in P6 step by step.

 

This is a skill that separates good planners from great ones, and it's more straightforward than most people think.